Educational

Vaden Health Center

By |2018-01-11T10:28:02+00:00December 9th, 2017|

[sliderpro id="23"] Allana Buick & Bers, Inc. (ABBAE) was retained by Stanford University to provide roof design consulting for multiple buildings with various  roofing systems throughout the campus. One of those buildings included the Vaden Health Care Center. ABBAE assisted in value engineering reviews and provided construction administration and construction monitoring services. Subsequent to construction,

San Mateo-Foster City School District – George Hall Elementary

By |2018-01-11T11:50:27+00:00December 9th, 2017|

[sliderpro id="44"] Allana Buick & Bers, Inc. (ABBAE) was retained by San Mateo-Foster City School District in San Mateo California to provide investigation, design, and construction monitoring services for the replacement of the roof on George Hall Elementary School.

University of Hawaii – Kapi’olani Community College

By |2018-01-11T11:57:04+00:00December 9th, 2017|

[sliderpro id="47"] Allana Buick & Bers, Inc. (ABBAE) was retained by the University of Hawai’i at Manoa (UH) to provide investigation and replacement solutions for the existing roof systems on two campus buildings at Kapiolani Community College. ABBAE provided investigation, remedial design and construction phase services for the Koki’o and Kopiko Buildings, totaling approximately 9,000

UC San Francisco – Institute of Regenerative Medicine

By |2018-01-11T10:35:06+00:00December 9th, 2017|

[sliderpro id="26"] Allana Buick & Bers, Inc. (ABBAE) was retained by UCSF to provide Peer Review and Water Test Monitoring on the new Institute of Regenerative Medicine (IRM) building in San Francisco. The IRM is a 73,000 SF steel-framed building on a contoured hillside site. The building is one to three stories and suspended over

University of Chicago Medical Center

By |2018-01-11T10:32:43+00:00December 9th, 2017|

[sliderpro id="25"] Allana Buick & Bers, Inc. (ABBAE) was retained by Rafael Vinoly Architects to provide waterproofing and roofing design and construction administration services for the University of Chicago for their new Hospital Pavilion in Chicago. The new hospital pavilion is an innovative patient care facility which will combine services currently located at multiple facilities

University of Hawaii – Watanabe and Gilmore Hall ReRoof

By |2018-01-11T11:55:31+00:00December 9th, 2017|

[sliderpro id="46"] Allana Buick & Bers, Inc. (ABBAE) was retained by the University of Hawai’i (UH) to provide investigation and remedial design services for two roof replacements on the main campus. ABBAE was retained by UH to perform investigative services for two buildings; Watanabe Hall and Gilmore Hall. Watanabe Hall contains the Department of Physics

University of Hawaii – Cancer Research Center of Hawaii

By |2018-01-11T10:44:03+00:00December 9th, 2017|

[sliderpro id="29"] Allana Buick & Bers, Inc. (ABBAE) was retained by the Architect of Record, Shimokawa Nakamura, Inc. (SN) to provide peer review services for the new construction of a cancer research center for the University of Hawai’i at Manoa (UH). The Cancer Research Center of Hawaii (CRCH) will be a 140,000 SF building on

UC Davis – Mondavi Center for Performing Arts

By |2018-01-11T12:05:29+00:00December 9th, 2017|

[sliderpro id="50"] Allana Buick & Bers, Inc. (ABBAE) was retained by the University of California Davis (UCD) to provide building enclosure expert consulting services for leaks in the newly-constructed Mondavi Center for Performing Arts located on the UCD campus. The Mondavi Center is a 104,000 SF, steel framed building containing two performance venues with performance,

UC Davis – Segundo Dining Commons

By |2018-01-11T11:59:00+00:00December 9th, 2017|

[sliderpro id="48"] Allana Buick & Bers, Inc. (ABBAE) was retained by the university to provide a building condition assessment of a partially constructed campus building. The University of California, Davis asked ABBAE to provide an assessment of The Segundo Dining Commons, a steel-frame building with pre-cast concrete and structural steel framework exteriors. Construction was halted

UC San Diego – Student Services Center

By |2018-01-11T12:38:08+00:00December 9th, 2017|

[sliderpro id="57"] Allana Buick & Bers, Inc. (ABBAE) was retained by the University of California San Diego (UCSD) to provide leak investigation services at the newly-constructed Student Services Center on the main campus. Completed and open for the fall of 2007, the five-story steel-frame building is over 100,000 SF and houses multiple departments including Financial

UC San Diego – University House

By |2018-01-11T12:41:54+00:00December 9th, 2017|

[sliderpro id="58"] Allana Buick & Bers, Inc. (ABBAE) provided a physical needs assessment on an historic University building. ABBAE was retained by IS Architecture to provide a reconstruction feasibility study for the University House at the University of California San Diego (UCSD). ABBAE’s scope of work included investigation and assessment of the roofing systems, exterior

Sweetwater Union High School District

By |2018-01-11T12:03:15+00:00December 9th, 2017|

[sliderpro id="49"] Allana Buick & Bers, Inc. (ABBAE) provided peer review and waterproofing services for the Sweetwater Union School District (SUHSD) as part of a bond program. Working with Gilbane and the SUHSD, ABBAE provided peer review services for nine schools, a combination of modernization and new construction projects. The schools included: School / City

Kenmore Junior High School

By |2018-01-11T12:08:13+00:00December 9th, 2017|

[sliderpro id="51"] Allana Buick & Bers, Inc. (ABBAE) was retained by NAC Architecture (NAC) to provide building envelope consulting services for the third phase of new construction and modernization of Kenmore High School. The project consisted of a 2-story classroom building and a commons/music/tech Ed/cafeteria building. ABBAE provided design, calculations, drawings, and specifications for all

SDCCD – Vocational Technology Center

By |2018-01-11T12:15:23+00:00December 9th, 2017|

[sliderpro id="52"] Allana Buick & Bers, Inc. (ABBAE) was retained by the San Diego Community College District (SDCCD) to provide construction monitoring services for the exterior wall and roof systems of a new campus building. The Career Technology Center (CTC) is an 85,000 SF, five-story steel frame building with a partial level below-grade. The building

San Francisco State University – Cesar Chavez Student Center

By |2018-01-11T12:18:02+00:00December 9th, 2017|

[sliderpro id="53"] Allana Buick & Bers, Inc (ABBAE) was retained by San Francisco State University (SFSU) to provide forensic investigation and remedial repair solutions for water leaks related to the exterior of a community building on a college campus. The Cesar Chavez Student Center at SFSU was originally built in 1975. The concrete building has

San Jose State University – Duncan Hall

By |2018-01-11T12:19:27+00:00December 9th, 2017|

[sliderpro id="54"] Allana Buick & Bers, Inc. (ABBAE) was retained by San Jose State University (SJSU) to conduct an investigation regarding the below grade leaks at the Carl D. Duncan Hall of Science (Duncan Hall). Duncan Hall is a seven story concrete building with partial basement and houses laboratories, classrooms and offices for the science

Santa Clara University – Bannan Hall

By |2018-01-11T12:22:41+00:00December 9th, 2017|

[sliderpro id="55"] Allana Buick & Bers, Inc. (ABBAE) was retained by Santa Clara University (SCU) to provide forensic investigation and construction management services for exterior cladding issues occurring at Bannan Hall on the SCU campus. Bannan Hall was completed in 1991. The three-story, 90,000 SF steel-frame building contains SCU’s civil and mechanical engineering schools. ABBAE

Ohlone College

By |2018-01-11T12:24:38+00:00December 9th, 2017|

[sliderpro id="56"] Allana Buick & Bers, Inc. (ABBAE) teamed with tBP Architecture to provide building envelope consulting services for 8 buildings on the Ohlone College Campus located in Fremont, California. These buildings were constructed in 1976 and are one, two and three stories, clad in cement plaster (stucco) over concrete walls, or stucco over light