Recreational

SAP Center

2020-05-20T12:56:19-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by HP Pavilion for remedial design and construction administration services for the roof replacement project at the HP Pavilion, SAP Center in San Jose, California. Constructed in 1988, HP Pavilion is a concrete structure with a concrete pile foundation system. The existing roof systems is a steel

Amon G. Carter Stadium

2020-05-15T15:15:20-07:00

Conley Group, An ABBAE Company, was retained by Texas Christian University to provide condition assessment, design review, water infiltration evaluation and testing, and waterproof consulting services for Amon G. Carter Stadium located in Fort Worth, Texas. Amon G. Carter Stadium is an open-air football stadium on the campus of Texas Christian University in Fort Worth,

Meyerson Symphony Center

2020-05-20T16:54:57-07:00

Conley Group, An ABBAE Company, was retained by City of Dallas to provide building enclosure commissioning, condition assessments, functional testing, design development, construction documents, bid phase support, and construction administration for Meyerson Symphony Center located in Dallas, Texas. Conley Group was selected by the City of Dallas to perform Building Envelope Consulting on this high

Dallas Museum of Art

2020-05-21T10:37:22-07:00

Conley Group, An ABBAE Company, was retained by City of Dallas to provide condition assessment, design development, construction documents, bid phase support, and construction administration for Dallas Museum of Art located in Dallas, Texas. Dallas Museum of Art is a world class facility that had fought through poorly performing roof systems to the point of

Hawaii Convention Center

2020-04-20T12:15:51-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the State of Hawaii and Architects Hawaii, Ltd. to provide design assistance and waterproofing consulting services to the Hawaii Tourism Authority/SMG Hawaii convention center located in Honolulu. Constructed in 1997, the 1.1 million SF convention center is a partially open-air facility consisting of extensive outdoor planters,

Santana Row – Block 6B

2023-09-26T17:47:48-07:00

Allana Buick & Bers, Inc. (ABB) was retained by Federal Investment Realty Trust (FRIT) to provide building enclosure consulting services at 3003 Olin Avenue at Santana Row in San Jose, California. The Block 6B project consists of two 4-story wood framed multi-family residential buildings over a common reinforced concrete below-grade parking structure. The apartment structure

Carlmont High School – Performing Arts Center

2017-12-13T06:33:10-08:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the Sequoia Union High School District (SUHSD) to provide curtain wall and waterproofing consulting services for a new Theatre Building at Carlmont High School. The new theatre building is a 22,000 SF performing arts center with a 500-seat theatre, a black box theatre, supporting space, classrooms

Hollywood Palladium

2020-04-20T14:39:01-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained to provide investigation and assessment of water intrusion to the exterior walls following a 2008 renovation. ABBAE provided investigation services, including destructive testing to exposed waterproofing of the below grade portion of the building, located on the north side. Our report provided the client with repair recommendations

The Getty Center

2018-03-12T14:39:27-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the J. Paul Getty Trust (The Getty Center) to provide consulting services for leak remediation to their complex. The Getty Center is a cultural complex dedicated to visual arts and humanities. The expansion opened in 1997 and consists of six interconnected buildings, terraces, courtyards and gardens.