Allana Buick & Bers (ABBAE) performed an assessment of the existing systems with recommendations for replacements, including ROI analysis comparison of equipment replacement. We provided cost savings and reduced energy consumption for the pumps and cooling tower.

The challenge of this installation was due to the elements – the installation had to be completed on a cold day. Despite the chill in the air, Las Vegas never sleeps. There was a major convention at the time, and the hotel was at 100% occupancy.

ABBAE provided monitoring services and successfully completed the install same day to minimize hotel outages and guest interference.