Archstone University Towne Center

2020-04-20T14:07:49-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained to investigate existing conditions and provide remedial repair alternatives related to wood-framed balcony decks at an apartment community in La Jolla, CA. To evaluate the existing construction of the structure for the purposes of preparing remedial designs, ABBAE met with building maintenance staff and observed limited destructive

Fashion Valley Mall

2020-04-20T14:08:35-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the general contractor to provide investigation and remedial repair solutions for water leaks at a retail center in San Diego, California. The Fashion Valley Mall (Fashion Valley) was experiencing leaks and moisture damage at bridges, elevated walkways, adjacent building wall sills, as well as expansion joints.

Escondido Promenade

2020-04-20T14:08:39-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by Federal Investment Realty Trust (FRIT) to provide building envelope leak investigation for Escondido Promenade located at 1266 Auto Park Way in Escondido, California. Escondido Promenade is a 222,000 SF shopping center, constructed in 1987. Significant water intrusion occurred after a facade renovation, a PVC roof replamcent,

UC San Diego – Student Services Center

2020-04-20T14:30:10-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the University of California San Diego (UCSD) to provide leak investigation services at the newly-constructed Student Services Center on the main campus. Completed and open for the fall of 2007, the five-story steel-frame building is over 100,000 SF and houses multiple departments including Financial Aid, Admissions

San Diego International Airport

2020-04-20T14:41:15-07:00

Allana Buick & Bers, Inc. (ABBAE) was retained by the design-build team, Turner Construction and architect (HNTB) to provide Building Envelope Consulting Services, including Engineer of Record services, on the $907 million Terminal 2 Expansion at the San Diego International Airport. The curtain wall and storefront present a unique structural challenge due to the 40